by vsplash | Mar 18, 2023
Oyster Point Marina Breakwater Modifications When the old concrete breakwater entrance to Oyster Point Marina was widened to handle new ferry service, wave action increased in the marina. To prevent boat damage, Yerba Buena was charged with installing floating docks...
by vsplash | Mar 18, 2023
Alviso Salt Pond Levees On this project, Yerba Buena repaired portions of the deteriorating Alviso Levee system at the southern end of the San Francisco Bay, near the cities of Sunnyvale and San Jose. The levees separate former commercial salt production ponds from...
by vsplash | Mar 18, 2023
Petaluma Flood Control The prime contract for this project called for the installation of 100 feet of steel sheetpile wall, repairs to the floodwall concrete pile cap, embankment slide repairs, and repair of a stormwater outfall. Yerba Buena performed all of the...
by vsplash | Mar 18, 2023
Hunters Point Seawall On this Navy project, Yerba Buena built 1,800 linear feet of 6-foot-high concrete seawall at the crest of a shoreline revetment at the former Hunters Point Naval Shipyard. We also installed a from freshwater wetlands, to. We placed more than 700...