by vsplash | Mar 18, 2023
Fort Point Building 989 Foundation Yerba Buena completed the design-build installation of a new foundation under a historic building on the shore of San Francisco Bay. The new, higher foundation was to meet current seismic standards and provide required clearance...
by vsplash | Mar 18, 2023
Wattis Coal Seam Fire Remediation In July 2012, the Seeley Fire swept across a Utah mountain, burning timbers that extended out of two portals of an abandoned mine and igniting the coal seam inside. In August 2013, the state of Utah contracted with Yerba Buena to...
by vsplash | Mar 18, 2023
Coho Fish Hatchery Building Yerba Buena’s team designed and constructed a 120 foot x 210-foot pre-engineered steel building for the Coho Salmon-Rearing Facility at the Don Clausen Fish Hatchery. The hatchery is owned by the U.S. Army Corps of Engineers and operated...
by vsplash | Mar 18, 2023
Oyster Point Marina Breakwater Modifications When the old concrete breakwater entrance to Oyster Point Marina was widened to handle new ferry service, wave action increased in the marina. To prevent boat damage, Yerba Buena was charged with installing floating docks...